High Quality Top Roller - PC200-8 Excavator Assembly Top Carrier Roller – Heli
High Quality Top Roller - PC200-8 Excavator Assembly Top Carrier Roller – Heli Detail:
PC200-8 Excavator Assembly Top Carrier Roller
Part Number
BRAND | CATALOGUE | ||||||||
BULLDOZER | D20 | D30 | D31 | D37 | D40 | D41 | D45 | D50 | D60 |
D65 | D68 | D75 | D80 | D85 | D150 | D155 | D275 | D355 | |
D3C | D3D | D4C | D4D | D4H | D5 | D6C | D6D | D6H | |
D7G | D8K | D8N | D9N | D10N | D11N | ||||
KOMATSU | PC30 | PC40 | PC45 | PC60 | PC75 | PC100 | PC120 | PC150 | PC200 |
PC220 | PC300 | PC350 | PC400 | ||||||
CATERPILLAR | E70B | E110 | E120B | E215 | E235 | E307 | E311 | E312 | E322 |
E180 | E240 | E200B | E320 | E300 | E300B | E330 | E325 | ||
HITACHI | EX30 | EX40 | EX60 | EX100 | EX120 | EX200 | EX220 | EX270 | EX300 |
EX400 | EX600 | UH043 | UH052 | UH53 | UH07 | UH081 | UH082 | UH083 | |
FIAT-HITACHI | FH120 | FH130 | FH150 | FH200 | FH220 | FH270 | FH300 | ||
VOLVO | EC55 | EC130 | EC150 | EC200 | EC210 | EC240 | EC290 | EC360 | |
DAEWOO | DH55 | DH130 | DH180 | DH200 | DH280 | DH300 | DH320 | ||
HYUNDAI | R60 | R130 | R200 | R210 | R220 | R290 | R320 | R914 | |
KATO | HD250 | HD400 | HD450 | HD700 | HD770 | HD820 | HD1250 | ||
KOBELCO | SK40 | SK60 | SK100 | SK120 | SK200 | SK220 | SK04-2 | SK07 | |
SK07N2 | SK09 | SK12 | SK14 | SK300 | SK310 | SK400 | |||
JCB | JS70 | JS75 | JS110 | JS130 | JS160 | JS180 | JS200 | JS220 | |
JS240 | JS260 | JS300 | JS330 | ||||||
SUMITOMO | SH70 | SH100 | SH120 | SH160 | SH200 | SH260 | SH265 | SH280 | SH300 |
SH340 | LS2650 | LS2800 | LS3400 | LS4300 | |||||
MX8 | SE200 | SE210 | SE280 | MX292 | SE350 | ||||
MITSUBISHI | MS110 | MS120 | MS140 | MS180 |
FAQ
1. You are a trader or a manufacture?
We are an industry and trade integration business, our factory located on Quanzhou Nanan Distric, and our sales department is in City centre of Xiamen. The distance is 80Kms, 1.5 hours.
2. How can I be sure the part will fit my excavator?
Give us correct model number/machine serial number/ any numbers on the parts itself. Or measure the parts give us dimension or drawing.
3. How about the payment terms?
We usually accept T/T or Trade Assurance. other terms also could be negotiated.
4. What is your minimum order?
It depends on what you are buying. Normally, our minimum order is one 20′ full container and LCL container (less than a container load) can be acceptable.
5. What is your delivery time?
FOB Xiamen or any Chinese port : 20 days . If there are any parts in stock , our delivery time is only 0-7 days.
6. What about Quality Control?
We have a perfect QC system for the perfect products. A team who will detect the product quality and specification piece carefully, monitoring every production process until packing is complete, to ensure product safety into container.
Product detail pictures:
Related Product Guide:
With state-of-the-art technologies and facilities, strict good quality regulate, reasonable cost, exceptional assistance and close co-operation with prospects, we're devoted to supplying the top benefit for our customers for High Quality Top Roller - PC200-8 Excavator Assembly Top Carrier Roller – Heli , The product will supply to all over the world, such as: Bogota, Monaco, Bogota, Our products are very popular in the word, like South American, Africa, Asia and so on. Companies to "create first-class products" as the goal, and strive to provide customers with high quality products, provide high-quality after-sales service and technical support, and customer mutual benefit, create a better career and future!
By Gabrielle from Washington - 2018.06.21 17:11
The factory has advanced equipment, experienced staffs and good management level, so product quality had assurance, this cooperation is very relaxed and happy!
By Jocelyn from Gabon - 2017.11.20 15:58