2021 China New Design Pc200-7 Carrier Roller - Hot sale heavy construction machinery equipment excavator undercarriage spare parts pc200 ex200 E325 top rollers carrier roller – Heli
2021 China New Design Pc200-7 Carrier Roller - Hot sale heavy construction machinery equipment excavator undercarriage spare parts pc200 ex200 E325 top rollers carrier roller – Heli Detail:
Hot sale heavy construction machinery equipment excavator undercarriage spare parts pc200 ex200 E325 top rollers carrier roller
Part Number
BRAND | CATALOGUE | ||||||||
BULLDOZER | D20 | D30 | D31 | D37 | D40 | D41 | D45 | D50 | D60 |
D65 | D68 | D75 | D80 | D85 | D150 | D155 | D275 | D355 | |
D3C | D3D | D4C | D4D | D4H | D5 | D6C | D6D | D6H | |
D7G | D8K | D8N | D9N | D10N | D11N | ||||
KOMATSU | PC30 | PC40 | PC45 | PC60 | PC75 | PC100 | PC120 | PC150 | PC200 |
PC220 | PC300 | PC350 | PC400 | ||||||
CATERPILLAR | E70B | E110 | E120B | E215 | E235 | E307 | E311 | E312 | E322 |
E180 | E240 | E200B | E320 | E300 | E300B | E330 | E325 | ||
HITACHI | EX30 | EX40 | EX60 | EX100 | EX120 | EX200 | EX220 | EX270 | EX300 |
EX400 | EX600 | UH043 | UH052 | UH53 | UH07 | UH081 | UH082 | UH083 | |
FIAT-HITACHI | FH120 | FH130 | FH150 | FH200 | FH220 | FH270 | FH300 | ||
VOLVO | EC55 | EC130 | EC150 | EC200 | EC210 | EC240 | EC290 | EC360 | |
DAEWOO | DH55 | DH130 | DH180 | DH200 | DH280 | DH300 | DH320 | ||
HYUNDAI | R60 | R130 | R200 | R210 | R220 | R290 | R320 | R914 | |
KATO | HD250 | HD400 | HD450 | HD700 | HD770 | HD820 | HD1250 | ||
KOBELCO | SK40 | SK60 | SK100 | SK120 | SK200 | SK220 | SK04-2 | SK07 | |
SK07N2 | SK09 | SK12 | SK14 | SK300 | SK310 | SK400 | |||
JCB | JS70 | JS75 | JS110 | JS130 | JS160 | JS180 | JS200 | JS220 | |
JS240 | JS260 | JS300 | JS330 | ||||||
SUMITOMO | SH70 | SH100 | SH120 | SH160 | SH200 | SH260 | SH265 | SH280 | SH300 |
SH340 | LS2650 | LS2800 | LS3400 | LS4300 | |||||
MX8 | SE200 | SE210 | SE280 | MX292 | SE350 | ||||
MITSUBISHI | MS110 | MS120 | MS140 | MS180 |
FAQ
1. You are a trader or a manufacture?
We are an industry and trade integration business, our factory located on Quanzhou Nanan Distric, and our sales department is in City centre of Xiamen. The distance is 80Kms, 1.5 hours.
2. How can I be sure the part will fit my excavator?
Give us correct model number/machine serial number/ any numbers on the parts itself. Or measure the parts give us dimension or drawing.
3. How about the payment terms?
We usually accept T/T or Trade Assurance. other terms also could be negotiated.
4. What is your minimum order?
It depends on what you are buying. Normally, our minimum order is one 20’ full container and LCL container (less than a container load) can be acceptable.
5. What is your delivery time?
FOB Xiamen or any Chinese port : 20 days . If there are any parts in stock , our delivery time is only 0-7 days.
6. What about Quality Control?
We have a perfect QC system for the perfect products. A team who will detect the product quality and specification piece carefully, monitoring every production process until packing is complete, to ensure product safety into container.
Product detail pictures:
Related Product Guide:
We provide good power in high-quality and progress,merchandising,revenue and internet marketing and operation for 2021 China New Design Pc200-7 Carrier Roller - Hot sale heavy construction machinery equipment excavator undercarriage spare parts pc200 ex200 E325 top rollers carrier roller – Heli , The product will supply to all over the world, such as: Philippines, Lebanon, Namibia, Based on our automatic production line, steady material purchase channel and quick subcontract systems have been built in mainland China to meet customer's wider and higher requirement in recent years. We have been looking forward to cooperating with more clients worldwide for common development and mutual benefit!Your trust and approval are the best reward for our efforts. Keeping honest, innovative and efficient, we sincerely expect that we can be business partners to create our brilliant future!
By April from Uruguay - 2017.05.21 12:31
After the signing of the contract, we received satisfactory goods in a short term, this is a commendable manufacturer.
By Nelly from India - 2018.09.29 13:24